Ongoing works

Some of our major projects under execution are:


KLIS Stage-III Project

Execution of Stage-III Pumping Station (5x30Mw) of Kalwakurthy Lift Irrigation scheme near Gudipally Gattu near Gouridevipally village Gopalpet Mandal,Mahaboobnagar Dist. of Andhra Pradesh on EPC Basis.


Estimated Cost of Project: Rs.631.98Crores


Kelo Project

Construction of Concrete Dam, Earthen Dam and its Appurtenant works including construction of Main canal 0M to 4320M with its structures complete of Kelo Project, Dist. Raigarh including obtaining required clearance from CWC


Estimated Cost of Project: Rs.116.55 Crores


Western Transport Corridor

Tamkur -Haveri Section of NH4 Project - Rehabilitation and upgrading of Chitradurga - Harihar Section (Km. 207 to Km.284) in the state of Karnataka Construction Package-4.

Estimated Cost of Project: Rs.207.56 Crores


Western Transport Corridor

Tamkur Haveri Section of NH4 Project - Rehabilitation and upgrading of Chitradurga-Harihar Section (Km.284 to Km.340) in the state of Karnataka Construction Package-5.


Estimated Cost of Project: Rs.196.66 Crores


GNSS Flood Flow Canal

Execution of works for Excavation of GNSS Flood Flow Canal from Owk Reservoir to Gandikota Reservoir including construction of Head Regulator and CM & CD works from Km. 0.000 to Km 16.500 in Kurnool District, A.P.


Estimated Cost of Project: Rs.147.21 Crores


Jigaon Project

Construction of pump with pumping machinery, EOT crane and switch yard construction of rising main with manifold, chamber and balancing tank for stage wise or independent scheme of LIS Group No.1 (LIS No.1, 10, 11 and 12)


Estimated Cost of Project: Rs.311.00Crores



Madurai Municipality UGD Work

Providing sewage collection system to uncovered areas and renovation of existing sewerage collection system in Madurai corporation.


Estimated Cost of Project: Rs.131.00 Crores


AMRP Lift Irrigation Project

Execution of Pumping Station (3X4 MW) of AMRP Irrigation Scheme near Chalkurthy (v) Peddavura Mandal of Nalgonda District, A.P. on EPC Basis


Estimated Cost of Project: 108.08 Crores


PACKAGE-4, PACAKGE-5 & PACAKGE-6:

Improvements to water supply in Ariyamangalam & Ponmalaipatty area of Tiruchirapalli City Corporation.

Estimated cost of Projects: 9085.55 Lakhs

 

Package-2

Formation of earth bund of Hundri River.

Estimated cost of Project : 7722 Lakhs